Project Title : Tehran-Shomal Freeway (Section 2 – Lot A) |
|
Location : Iran - Alborz |
Status : Under Construction - Road |
Start Date : 2024 | End Date : 2025 |
Technical Specifications : Specifications Length of project: 3.7 km 1 Bridges with length of 80 m 8 Tunnels with total length of 2621 m (the longest one is 931 m) Length of Retaining walls: 120 ml Earth works: 150,000 m3 Tunnel Excavation: 235,000 m3 Pile Drilling: 1,080 ml Steel works: 5,000 ton Heavy steel works: 150 ton Reinforced Earth Wall: 30,000 m3 Formworks: 102,000 m2 Concrete: 72,280 m3 Masonry: 3,700 m3 Sub base & Base: 3,000 m3 |
Employer Tehran-Shomal Fwy. Co. Project Management Rahyab Melal Consulting Engineers Engineer Faradid Consulting Engineers --------------------------------------------------------------- Contract Price : 21,000,000 USD
|
Description:
Tehran-Shomal Fwy. is a freeway in Northern Iran, connecting Tehran to Chalus and cities of western Mazandaran. Tehran-Shomal Freeway has been devided to 4 sections. Section 2 of this freeway is from Shahrestanak to Zanguleh bidge in Chalous-Karaj road. The length of this section is about 21 kmand this project which is named “Lot A” consist of the first lot of section 2 and with the length of 3.7 km. |
|
A highway with purpose of environmental pollution reduction and tourism development A collection of engineering structures including tunnel, great bridge, retaining wall, reinforced earth wall, pile and pier passing over natural and artificial obstacles (river and traffic) |