Project Title : South Mond Road Reconstruction

Location : Iran - Bushehr
Status : Completed - Road
Start Date : 2009 End Date : 2013
Technical Specifications :

Specifications

Total length of project: 23 km

Totally 28 culverts

Earth works: 1,200,000 m3

Concrete: 40,000 m3

Formworks: 18,000 m2

Masonry: 11,000 m3

Sub Base: 32,000 m3

Base : 28,000 m3

Asphalt :34,000 ton

Transmission and Install steel pipe diameter

4 inch to 8 inch: 16 km

Employer

Iran National Oil Company, Oil Engineering and Development

Engineer

Gostaresh Shargh Rah Consulting Engineers

Updated Contract Price

17,500,000 USD

 

Description :

This project is located at 95 km south-east of Bushehr city and provides access to oil well No. 6 from coast road in Lavar region. It consists of geometric modification of road, widening, rock excavation, slope stabilization, performing pavement and finishing.


.