Project Title : Yadegar-e-Emam Highway (Lot 3)

Location : Iran - Tehran
Status : Completed - Road
Start Date :

Contract No.1                   2003

Contract No.2                   2008

End Date :

Contract No.1                  2008

Contract No.2                   2010

Technical Specifications :

Total length of project contains major axis, minor axis, ramps and loops: 13,335 m

Width of highway: 30 m

6 bridges with different length & bays:

-One double span bridge, each span 16.5 m long

-One underpass bridge with a 12 meter span & 35 m width

-Box culvert bridge with a 9 meter span and 180 meter length

-One underpass with a 12 meter span and 42 meter length

-The great bridge over Darake river with a 30 meter span and 160 meter length in two separate 15 meter bonds

-The great bridges over Chamran highway as flyover junction with six 26 meter spans

and four spans with average length of 20 meter totally 226 meter length in two separate bonds of 15 meter

Total length of retaining walls with 1 to 15 meters high: 3,900 m

Earth works: 1,200,000 m3

Steel works: 5,100 ton

Heavy steel works: 2,200 ton

Formworks: 150,000 m2

Concrete: 90,000 m3

Masonry: 66,000m3

Sub base: 13,900 m3

Base: 12,700 m3

Asphalt: 46,000 ton

Employer

Tehran Municipality

Engineer

Passillo Consulting Engineers

Total Updated Contract Prices

79,000,000 USD


 

Description :