Project Title : Gelevard Reservoir Dam - D&B (Concrete Face Rockfill Dam) |
|
Location : Iran - Mazandaran |
Status : Completed - Dam |
Start Date : 2009 | End Date : 2019 |
Technical Specifications : Height of dam from foundation: 113 m Length of crest: 270 m Excavation: 2,350,000 m3 Rock filling: 2,640,000 m3 Steel works: 4,100 ton Formworks: 90,000 m2 Concrete: 97,000 m3 Diversion system consists of two earth filled cofferdams and diversion tunnel 450m length and 5m diameter Lateral spillway with ogee Spillway capacity: 1,940 m3/s length of galleries: 3,400 m Grouting curtain: 250,000 ml Grout cement:40,000 ton |
Employer Mazandaran Regional Water Owner Consultant Sakoo Consulting Engineers Updated Contract Price 263,000,000 USD Reservoir Volume 115,500,000 m3 Annual Annual Water Discharge 189,000,000 m3
|
Description :
The project engineer is Ab-Niru Consulting Engineers that is the responsible partner for engineering works in the joint venture made of Ev-Yol and Ab-Niru. Stuky Ltd is also employed by the joint venture for approval of the key structures design. Gelevard reservoir dam Located at Neka river at 45 km. far from south-east of Neka city-Mazandaran. The contract includes all works needed for Design and Construction of dam and appurtenant structures such as dam body (CFRD), spillway, galleries, water-tight curtain, intake & valve-house structures, bottom-outlet & irrigation tunnel and complete hydro-mechanical, electrical & instrumentation works. Main purpose of the project is to supplying irrigation water to Neka and Beh-shahr area, and to protect them from floods & improvement of animal husbandry. |
|