Project Title : Gelevard Reservoir Dam - D&B (Concrete Face Rockfill Dam)

Location : Iran - Mazandaran
Status : Completed - Dam
Start Date : 2009 End Date : 2019
Technical Specifications :

Height of dam from foundation: 113 m

Length of crest: 270 m

Excavation: 2,350,000 m3

Rock filling: 2,640,000 m3

Steel works: 4,100 ton

Formworks: 90,000 m2

Concrete: 97,000 m3

Diversion system consists of two earth filled cofferdams and diversion tunnel 450m length and 5m diameter

Lateral spillway with ogee

Spillway capacity: 1,940 m3/s

length of galleries: 3,400 m

Grouting curtain: 250,000 ml

Grout cement:40,000 ton

Employer

Mazandaran Regional Water

Owner Consultant

Sakoo Consulting Engineers

Updated Contract Price

263,000,000 USD

Reservoir Volume

115,500,000 m3 Annual

Annual Water Discharge

189,000,000 m3


 

Description :

The project engineer is Ab-Niru Consulting Engineers that is the responsible partner for engineering works in the joint venture made of Ev-Yol and Ab-Niru.

Stuky Ltd is also employed by the joint venture for approval of the key structures design.

Gelevard reservoir dam Located at Neka river at 45 km. far from south-east of Neka city-Mazandaran. The contract includes all works needed for Design and Construction of dam and appurtenant structures such as dam body (CFRD), spillway, galleries, water-tight curtain, intake & valve-house structures, bottom-outlet & irrigation tunnel and complete hydro-mechanical, electrical & instrumentation works. Main purpose of the project is to supplying irrigation water to Neka and Beh-shahr area, and to protect them from floods & improvement of animal husbandry.